Skip to main content Start main content
LER 1

With the aim of transforming the Library into a modern learning hub, the project involves the construction of a new floor to create 2,080 m2 NOFA of library space, as well as the revitalization of existing floors in the library building. The newly constructed sixth floor was completed and opened for use in July 2022. The majority of the revitalization works on G/F to 5/F have been completed, and the remaining works was completed in October 2023.  

LER - Inside  2

This project has adopted various forms of energy efficient features and renewable technologies, including variable speed drive for chiller, demand control of supply air, heat energy reclaim of exhaust air, building energy management system, photovoltaic system and low emissivity insulating glass.

The PolyU Library Extension Project won the Best of Design Awards from The Architect’s Newspaper under the category ‘Library’ in December 2022.

Your browser is not the latest version. If you continue to browse our website, Some pages may not function properly.

You are recommended to upgrade to a newer version or switch to a different browser. A list of the web browsers that we support can be found here