Location: W401b Surface Engineering Workshop
Period of Use: At maximum 6 months
Facilities:
- Workstation (1.5 M2, workbench x 1, chair x 1)
- secured storage (locker)
- shared electric mains
- shared hand tools
Niche:
- Located in the room of the Physical Vapor Deposition (PVD) facilities inside the Surface Engineering workshop
- Adjacent to the facilities of the Surface Engineering Workshop